Maan Industrial Park
Name of Project: Ma’an Industrial Park
Year: 1997
Location: Jordan- Ma’an Governorate
Client: Jordan Industrial Estates Corporation
Main Project Features:
1. Administrative complex situated in phase (1) of the project with a total roof area of (2,075) m2.
2. (122) Investment plots distributed over (9) investment sectors for phase (1) of the project, (152) investment plots distributed over (12) investment sectors for phase (2) of the project, and (91) investment plots distributed over (8) investment sectors for phase (3) of the project.
3. Integrated networks of primary and secondary roads of different widths with a total length of (15’357) m and a total paved area of (162’600) m2 for all (3 three phases.
4. Integrated infrastructure networks (water, storm, sewerage, electricity, street lighting, communications, and fire hydrants) for each project phase.
5. Activated sludge “Extended Aeration” wastewater treatment plant situated in the northeast part of the project where the dominant wind direction is western to south-western.
6. 45-meter-high reinforced concrete elevated water tank with a storage capacity of 450 m3.
7. One reinforced concrete groundwater reservoir for each project phase with a capacity of (1500) m3.
8. Allocation of (23,700) m2 in phase (1) of the project for central transformer station installation.
9. Allocation of (3,000) m2 in phase (1) of the project for primary exchange construction.
10. Entrance gates to phase (1), (2) and phase (3).